Create comprehensive sprint planning documentation for Core Architecture
Correction sprint. This addresses three fatal architectural problems from
v1.0.0 release.
Sprint documents include:
- Executive proposal with architecture analysis
- Detailed implementation guide with code snippets
- Issue breakdown with dependencies
- Sprint summary with approval checklist
Sprint creates 10 issues in Gitea milestone 29:
- Issues #19-28 covering package rename, MCP protocol implementation,
Docker infrastructure, testing, and documentation
- Total estimated effort: 19-28 hours (1 week sprint)
- All issues properly sized (S/M), labeled, and dependency-tracked
This is attempt #3 - all details from architectural correction prompt
have been captured.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>