docs: update references and plugin configurations
- Update manifest-schema.md with latest schema changes - Refine CLAUDE.md documentation - Update MCP-WIKIJS, PLUGIN-PMO, PLUGIN-PROJMAN references - Fix wikijs_client.py configuration - Update plugin configs for cmdb-assistant and projman - Add root .mcp.json for project-level MCP configuration 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
@@ -197,7 +197,7 @@ projman-pmo/
|
||||
|
||||
**Critical Differences from projman:**
|
||||
- **NO** `GITEA_REPO` → operates on all repositories
|
||||
- **NO** `WIKIJS_PROJECT` → operates on entire `/hyper-hive-labs` namespace
|
||||
- **NO** `WIKIJS_PROJECT` → operates on entire `/your-org` namespace
|
||||
- Same shared MCP servers at `../mcp-servers/`
|
||||
|
||||
### Environment Variables
|
||||
@@ -282,10 +282,10 @@ User: /pmo-status
|
||||
|
||||
PMO: Projects Overview:
|
||||
|
||||
CuisineFlow: Sprint in progress, 60% complete
|
||||
└─ Blocking: CuisineFlow-Site deployment
|
||||
Main-App: Sprint in progress, 60% complete
|
||||
└─ Blocking: Main-App-Site deployment
|
||||
|
||||
I notice CuisineFlow-Site is waiting on API changes.
|
||||
I notice Main-App-Site is waiting on API changes.
|
||||
Use projman in the cuisineflow-site repo to plan the sync work.
|
||||
```
|
||||
|
||||
@@ -309,7 +309,7 @@ User: /pmo-status
|
||||
PMO: Projects Overview
|
||||
================
|
||||
|
||||
CuisineFlow (main product)
|
||||
Main-App (main product)
|
||||
├── Sprint: Intuit Engine Extraction
|
||||
├── Status: In Progress (60%)
|
||||
├── Issue: #47
|
||||
@@ -317,13 +317,13 @@ PMO: Projects Overview
|
||||
├── Next: API testing
|
||||
└── Timeline: On track (1 week remaining)
|
||||
|
||||
CuisineFlow-Site (demo)
|
||||
Main-App-Site (demo)
|
||||
├── Sprint: Dashboard Updates
|
||||
├── Status: Waiting on dependencies
|
||||
├── Issue: #12
|
||||
├── Blockers: Depends on CuisineFlow #47 (API changes)
|
||||
├── Blockers: Depends on Main-App #47 (API changes)
|
||||
├── Next: Deploy when API ready
|
||||
└── Timeline: Blocked (waiting on CuisineFlow)
|
||||
└── Timeline: Blocked (waiting on Main-App)
|
||||
|
||||
Intuit-Engine (service)
|
||||
├── Sprint: Initial Setup
|
||||
@@ -333,7 +333,7 @@ PMO: Projects Overview
|
||||
├── Next: Service boundary definition
|
||||
└── Timeline: Not started
|
||||
|
||||
HHL-Site (marketing)
|
||||
Company-Site (marketing)
|
||||
├── Sprint: Content Updates
|
||||
├── Status: Complete
|
||||
├── Issue: #8 (closed)
|
||||
@@ -342,14 +342,14 @@ PMO: Projects Overview
|
||||
└── Timeline: Ready for deployment
|
||||
|
||||
Cross-Project Insights:
|
||||
- CuisineFlow-Site blocked by CuisineFlow #47
|
||||
- Main-App-Site blocked by Main-App #47
|
||||
- Intuit-Engine needs architectural guidance
|
||||
- HHL-Site ready for deployment
|
||||
- Company-Site ready for deployment
|
||||
|
||||
Suggested Actions:
|
||||
1. Prioritize CuisineFlow #47 completion (unblocks Site)
|
||||
1. Prioritize Main-App #47 completion (unblocks Site)
|
||||
2. Schedule architecture review for Intuit-Engine
|
||||
3. Deploy HHL-Site content updates
|
||||
3. Deploy Company-Site content updates
|
||||
```
|
||||
|
||||
**Success Criteria:**
|
||||
@@ -375,15 +375,15 @@ PMO: Priority Analysis Across Projects
|
||||
=================================
|
||||
|
||||
Critical (Blocks launches):
|
||||
1. CuisineFlow #47 - Intuit Engine Extraction
|
||||
→ Blocks: CuisineFlow v2.0 launch (Nov 15)
|
||||
→ Blocks: CuisineFlow-Site deployment
|
||||
1. Main-App #47 - Intuit Engine Extraction
|
||||
→ Blocks: Main-App v2.0 launch (Nov 15)
|
||||
→ Blocks: Main-App-Site deployment
|
||||
→ Status: 60% complete, 1 week remaining
|
||||
→ Recommendation: Maintain focus
|
||||
|
||||
High (Important features):
|
||||
2. CuisineFlow-Site #12 - Dashboard Updates
|
||||
→ Depends on: CuisineFlow #47
|
||||
2. Main-App-Site #12 - Dashboard Updates
|
||||
→ Depends on: Main-App #47
|
||||
→ Status: Waiting
|
||||
→ Recommendation: Begin planning, wait for #47
|
||||
|
||||
@@ -393,14 +393,14 @@ PMO: Priority Analysis Across Projects
|
||||
→ Recommendation: Schedule architecture review
|
||||
|
||||
Medium (Enhancements):
|
||||
4. HHL-Site #8 - Content Updates
|
||||
4. Company-Site #8 - Content Updates
|
||||
→ Status: Complete, ready to deploy
|
||||
→ Recommendation: Deploy this week
|
||||
|
||||
Resource Analysis:
|
||||
Leo (primary developer):
|
||||
- Working on: CuisineFlow #47 (Critical)
|
||||
- Next: CuisineFlow-Site #12 (High)
|
||||
- Working on: Main-App #47 (Critical)
|
||||
- Next: Main-App-Site #12 (High)
|
||||
- Later: Intuit-Engine #3 (High)
|
||||
|
||||
⚠️ Potential Conflict:
|
||||
@@ -438,27 +438,27 @@ PMO: Project Dependencies
|
||||
|
||||
Intuit-Engine (service)
|
||||
↓ (must complete before)
|
||||
CuisineFlow (main)
|
||||
Main-App (main)
|
||||
↓ (API changes required by)
|
||||
CuisineFlow-Site (demo)
|
||||
Main-App-Site (demo)
|
||||
↓ (deploy together)
|
||||
Customer VPS (deployments)
|
||||
|
||||
Detailed Dependencies:
|
||||
|
||||
1. CuisineFlow → Intuit-Engine
|
||||
1. Main-App → Intuit-Engine
|
||||
Type: Service extraction
|
||||
Status: In progress
|
||||
Blocker: Must complete #47 before v2.0 launch
|
||||
Impact: High (blocks launch)
|
||||
|
||||
2. CuisineFlow → CuisineFlow-Site
|
||||
2. Main-App → Main-App-Site
|
||||
Type: Feature sync
|
||||
Status: Waiting
|
||||
Blocker: Dashboard updates need API changes from #47
|
||||
Impact: Medium (demo consistency)
|
||||
|
||||
3. CuisineFlow → Customer VPS
|
||||
3. Main-App → Customer VPS
|
||||
Type: Deployment
|
||||
Status: Pending
|
||||
Blocker: v2.0 launch must complete before customer updates
|
||||
@@ -466,16 +466,16 @@ PMO: Project Dependencies
|
||||
|
||||
Deployment Order:
|
||||
1. Complete Intuit-Engine service extraction
|
||||
2. Deploy CuisineFlow v2.0 to production
|
||||
3. Sync CuisineFlow-Site demo
|
||||
2. Deploy Main-App v2.0 to production
|
||||
3. Sync Main-App-Site demo
|
||||
4. Update customer VPS instances
|
||||
|
||||
Critical Path:
|
||||
Intuit-Engine (#3) → CuisineFlow (#47) → Site (#12) → Customer VPS
|
||||
Intuit-Engine (#3) → Main-App (#47) → Site (#12) → Customer VPS
|
||||
Estimated timeline: 3 weeks total
|
||||
|
||||
Risks:
|
||||
- CuisineFlow #47 delay would cascade to all downstream
|
||||
- Main-App #47 delay would cascade to all downstream
|
||||
- Customer VPS updates have Nov 20 deadline
|
||||
```
|
||||
|
||||
@@ -505,9 +505,9 @@ PMO: Resource Conflict Analysis
|
||||
|
||||
Leo (Developer):
|
||||
Assigned to:
|
||||
- CuisineFlow #47: Intuit Engine extraction (Priority: Critical)
|
||||
- CuisineFlow-Site #12: Dashboard redesign (Priority: High)
|
||||
- HHL-Site #8: Content update (Priority: Medium)
|
||||
- Main-App #47: Intuit Engine extraction (Priority: Critical)
|
||||
- Main-App-Site #12: Dashboard redesign (Priority: High)
|
||||
- Company-Site #8: Content update (Priority: Medium)
|
||||
- Intuit-Engine #3: Service setup (Priority: High)
|
||||
|
||||
Conflict Analysis:
|
||||
@@ -517,15 +517,15 @@ PMO: Resource Conflict Analysis
|
||||
- Timeline: 2 weeks available
|
||||
|
||||
Recommendations:
|
||||
1. FOCUS: CuisineFlow #47 (Critical, blocks launch)
|
||||
1. FOCUS: Main-App #47 (Critical, blocks launch)
|
||||
→ Keep as primary focus
|
||||
→ Estimated completion: 1 week
|
||||
|
||||
2. QUEUE: CuisineFlow-Site #12 (High, depends on #47)
|
||||
2. QUEUE: Main-App-Site #12 (High, depends on #47)
|
||||
→ Start after #47 completes
|
||||
→ Natural sequencing
|
||||
|
||||
3. DELEGATE: HHL-Site #8 (Medium, content work)
|
||||
3. DELEGATE: Company-Site #8 (Medium, content work)
|
||||
→ Can be handled by marketing team
|
||||
→ Low technical complexity
|
||||
|
||||
@@ -536,14 +536,14 @@ PMO: Resource Conflict Analysis
|
||||
Timeline Conflict:
|
||||
|
||||
Without changes:
|
||||
Week 1-2: CuisineFlow #47
|
||||
Week 1-2: Main-App #47
|
||||
Week 3-4: Site #12 + Engine #3 (CONFLICT)
|
||||
|
||||
With recommendations:
|
||||
Week 1-2: CuisineFlow #47 (FOCUS)
|
||||
Week 3: CuisineFlow-Site #12 (QUEUE)
|
||||
Week 1-2: Main-App #47 (FOCUS)
|
||||
Week 3: Main-App-Site #12 (QUEUE)
|
||||
Week 4: Intuit-Engine #3 (SCHEDULE)
|
||||
HHL-Site #8: Marketing (DELEGATE)
|
||||
Company-Site #8: Marketing (DELEGATE)
|
||||
|
||||
Apply recommendations?
|
||||
```
|
||||
@@ -571,18 +571,18 @@ PMO: Deployment Schedule
|
||||
===================
|
||||
|
||||
Week of Nov 6:
|
||||
- CuisineFlow: Continue Sprint #47 (Intuit Engine)
|
||||
- HHL-Site: Deploy content updates (#8) ✅
|
||||
- Main-App: Continue Sprint #47 (Intuit Engine)
|
||||
- Company-Site: Deploy content updates (#8) ✅
|
||||
|
||||
Week of Nov 13:
|
||||
- CuisineFlow: Complete Sprint #47 ⚠️
|
||||
- Main-App: Complete Sprint #47 ⚠️
|
||||
→ Critical: Must complete by Nov 15 for launch
|
||||
- CuisineFlow-Site: Begin Dashboard updates (#12)
|
||||
- Main-App-Site: Begin Dashboard updates (#12)
|
||||
|
||||
Week of Nov 20:
|
||||
- CuisineFlow: Deploy v2.0 to production 🚀
|
||||
- Main-App: Deploy v2.0 to production 🚀
|
||||
→ Deployment window: Nov 20-22
|
||||
- CuisineFlow-Site: Sync demo with v2.0
|
||||
- Main-App-Site: Sync demo with v2.0
|
||||
- Customer VPS: Begin rollout (Deadline: Nov 20)
|
||||
|
||||
Week of Nov 27:
|
||||
@@ -590,19 +590,19 @@ PMO: Deployment Schedule
|
||||
- Intuit-Engine: Begin service implementation (#3)
|
||||
|
||||
Critical Dates:
|
||||
- Nov 15: CuisineFlow v2.0 feature freeze
|
||||
- Nov 15: Main-App v2.0 feature freeze
|
||||
- Nov 20: Production deployment
|
||||
- Nov 20: Customer VPS deadline
|
||||
- Nov 22: Demo site sync
|
||||
|
||||
Dependencies:
|
||||
✅ Intuit-Engine service boundaries defined
|
||||
🔄 CuisineFlow #47 in progress (60%)
|
||||
⏳ CuisineFlow-Site #12 waiting
|
||||
🔄 Main-App #47 in progress (60%)
|
||||
⏳ Main-App-Site #12 waiting
|
||||
⏳ Customer VPS rollout pending
|
||||
|
||||
Risks:
|
||||
⚠️ CuisineFlow #47 delay would impact:
|
||||
⚠️ Main-App #47 delay would impact:
|
||||
- v2.0 launch date (Nov 20)
|
||||
- Customer VPS deadline (Nov 20)
|
||||
- Demo site sync (Nov 22)
|
||||
@@ -632,7 +632,7 @@ PMO: Searching lessons across all projects...
|
||||
|
||||
Found 5 relevant lessons:
|
||||
|
||||
CuisineFlow:
|
||||
Main-App:
|
||||
- Sprint 08: Service boundary issues with shared DB
|
||||
Tags: #service-extraction #database #refactoring
|
||||
Key: Define boundaries at data model level first
|
||||
@@ -646,13 +646,13 @@ PMO: Searching lessons across all projects...
|
||||
Tags: #service-extraction #dependencies
|
||||
Key: Watch for import cycles
|
||||
|
||||
CuisineFlow-Site:
|
||||
Main-App-Site:
|
||||
- Sprint 05: Sync issues during backend refactor
|
||||
Tags: #sync #refactoring
|
||||
Key: Coordinate deployments during major changes
|
||||
|
||||
Shared Patterns:
|
||||
- /hyper-hive-labs/shared/architecture-patterns/service-extraction
|
||||
- /your-org/shared/architecture-patterns/service-extraction
|
||||
Key: Service Extraction Playbook
|
||||
|
||||
Common Themes:
|
||||
@@ -672,15 +672,15 @@ User: /pmo-status
|
||||
PMO: [Shows status]
|
||||
|
||||
Resource Analysis:
|
||||
- Leo: 3 active projects (CuisineFlow, Site, Engine)
|
||||
- Marketing: 1 project (HHL-Site)
|
||||
- Leo: 3 active projects (Main-App, Site, Engine)
|
||||
- Marketing: 1 project (Company-Site)
|
||||
|
||||
Bottleneck detected: Leo is on critical path for all technical work
|
||||
|
||||
Recommendations:
|
||||
1. Prioritize work that unblocks others
|
||||
2. Consider hiring/contracting for parallel work
|
||||
3. Delegate non-critical work (HHL-Site content)
|
||||
3. Delegate non-critical work (Company-Site content)
|
||||
|
||||
Would you like a detailed resource allocation report?
|
||||
```
|
||||
@@ -690,18 +690,18 @@ PMO: [Shows status]
|
||||
```
|
||||
User: Plan the v2.0 release across all affected projects
|
||||
|
||||
PMO: Release Coordination: CuisineFlow v2.0
|
||||
PMO: Release Coordination: Main-App v2.0
|
||||
======================================
|
||||
|
||||
Affected Projects:
|
||||
1. CuisineFlow (main product)
|
||||
1. Main-App (main product)
|
||||
2. Intuit-Engine (new service)
|
||||
3. CuisineFlow-Site (demo)
|
||||
3. Main-App-Site (demo)
|
||||
4. Customer VPS instances
|
||||
|
||||
Pre-Release Checklist:
|
||||
✅ Intuit-Engine service deployed
|
||||
🔄 CuisineFlow #47 complete (60%)
|
||||
🔄 Main-App #47 complete (60%)
|
||||
⏳ Integration tests pending
|
||||
⏳ Demo site updates pending
|
||||
⏳ Customer migration scripts ready
|
||||
@@ -712,12 +712,12 @@ PMO: Release Coordination: CuisineFlow v2.0
|
||||
→ Duration: 2 hours
|
||||
→ Rollback plan: Ready
|
||||
|
||||
2. Deploy CuisineFlow v2.0 (main app)
|
||||
2. Deploy Main-App v2.0 (main app)
|
||||
→ Date: Nov 20
|
||||
→ Duration: 4 hours
|
||||
→ Rollback plan: Ready
|
||||
|
||||
3. Sync CuisineFlow-Site (demo)
|
||||
3. Sync Main-App-Site (demo)
|
||||
→ Date: Nov 22
|
||||
→ Duration: 1 hour
|
||||
→ Dependencies: Step 2 complete
|
||||
@@ -767,11 +767,11 @@ shared_patterns = await wikijs.get_shared_docs("architecture-patterns")
|
||||
User: Create a shared pattern document for service extraction
|
||||
|
||||
PMO: I'll create a pattern document based on lessons from:
|
||||
- CuisineFlow Sprint 08
|
||||
- CuisineFlow Sprint 12
|
||||
- Main-App Sprint 08
|
||||
- Main-App Sprint 12
|
||||
- Intuit-Engine Sprint 02
|
||||
|
||||
Creating: /hyper-hive-labs/shared/architecture-patterns/service-extraction
|
||||
Creating: /your-org/shared/architecture-patterns/service-extraction
|
||||
|
||||
Service Extraction Pattern
|
||||
=========================
|
||||
@@ -855,7 +855,7 @@ PMO: I'll create a pattern document based on lessons from:
|
||||
**Deliverable:** Validated PMO plugin integrated with projman
|
||||
|
||||
**Tasks:**
|
||||
1. Test with multiple projects (CuisineFlow, Site, Engine, HHL-Site)
|
||||
1. Test with multiple projects (Main-App, Site, Engine, Company-Site)
|
||||
2. Simulate deployment coordination scenarios
|
||||
3. Test priority conflict resolution
|
||||
4. Validate dependency tracking
|
||||
@@ -911,10 +911,10 @@ PMO: I'll create a pattern document based on lessons from:
|
||||
```
|
||||
User: /pmo-status
|
||||
|
||||
PMO: CuisineFlow-Site: Waiting on dependencies
|
||||
Blocked by: CuisineFlow #47 (API changes)
|
||||
PMO: Main-App-Site: Waiting on dependencies
|
||||
Blocked by: Main-App #47 (API changes)
|
||||
|
||||
Recommendation: Focus resources on CuisineFlow #47 to unblock Site work
|
||||
Recommendation: Focus resources on Main-App #47 to unblock Site work
|
||||
```
|
||||
|
||||
### Example 2: Resource Conflict Resolution
|
||||
@@ -926,8 +926,8 @@ PMO: Leo assigned to 4 tasks across 3 projects
|
||||
Estimated: 4 weeks work in 2 weeks timeline
|
||||
|
||||
Recommendations:
|
||||
- Maintain focus on Critical priority (CuisineFlow #47)
|
||||
- Delegate content work (HHL-Site #8) to marketing
|
||||
- Maintain focus on Critical priority (Main-App #47)
|
||||
- Delegate content work (Company-Site #8) to marketing
|
||||
- Schedule architectural review (Intuit-Engine #3) as team session
|
||||
```
|
||||
|
||||
@@ -936,13 +936,13 @@ PMO: Leo assigned to 4 tasks across 3 projects
|
||||
```
|
||||
User: /pmo-schedule
|
||||
|
||||
PMO: Critical Path: Engine → CuisineFlow → Site → Customer VPS
|
||||
PMO: Critical Path: Engine → Main-App → Site → Customer VPS
|
||||
Deadline: Nov 20 (Customer VPS commitment)
|
||||
|
||||
Current: Week 1 of 3
|
||||
Status: On track
|
||||
|
||||
Risk: If CuisineFlow #47 delayed, entire timeline at risk
|
||||
Risk: If Main-App #47 delayed, entire timeline at risk
|
||||
Mitigation: Daily progress monitoring
|
||||
```
|
||||
|
||||
|
||||