Files
leo-claude-mktplace/plugins/projman/skills/wbs.md
lmiranda 2d51df7a42 feat(marketplace): command consolidation + 8 new plugins (v8.1.0 → v9.0.0) [BREAKING]
Phase 1b: Rename all ~94 commands across 12 plugins to /<noun> <action>
sub-command pattern. Git-flow consolidated from 8→5 commands (commit
variants absorbed into --push/--merge/--sync flags). Dispatch files,
name: frontmatter, and cross-reference updates for all plugins.

Phase 2: Design documents for 8 new plugins in docs/designs/.

Phase 3: Scaffold 8 new plugins — saas-api-platform, saas-db-migrate,
saas-react-platform, saas-test-pilot, data-seed, ops-release-manager,
ops-deploy-pipeline, debug-mcp. Each with plugin.json, commands, agents,
skills, README, and claude-md-integration. Marketplace grows from 12→20.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-06 14:52:11 -05:00

1.3 KiB

description
description
Work Breakdown Structure skill for decomposing projects and sprints into implementable work packages

Work Breakdown Structure (WBS)

Purpose

Bridges project-level epics and sprint-level issues. Used by /project plan to create the initial decomposition and by /sprint plan to refine sprint scope.

Wiki Page

Page name: WBS: {Name} (e.g., WBS: Driving School SaaS)

Dependency Header

> **Project:** {Name}
> **Sprint:** N/A (project-level, refined per sprint)
> **Issues:** N/A
> **Parent:** Project: {Name}
> **Created:** YYYY-MM-DD
> **Status:** Draft | Active | Complete

Decomposition Rules

  1. Level 1: Epics (from project charter)
  2. Level 2: Work packages (groupings within an epic — typically 1 sprint each)
  3. Level 3: Tasks (become Gitea issues — must be S or M size per task-sizing.md)

Sprint Refinement

During /sprint plan, the planner:

  1. Loads the WBS
  2. Identifies the next unstarted work packages
  3. Creates issues from Level 3 tasks
  4. Marks consumed work packages as "Sprint-X" in the WBS

Integration

  • /project plan creates the initial WBS from epic decomposition
  • /sprint plan consumes WBS work packages to create sprint issues
  • /sprint close updates WBS with completion status
  • /project status aggregates WBS progress for project-level view